Meter Relocation & Permanent Connection Fees

We charge $200 per inspection plus a $75.00 compliance fee.

There may also be a $300 thru-joint fee, typically this is not required when the distribution box is on the boundary of the site.

Additional fees

We charge a $1.20 per kilometre rural charge (for example, those who live in Rolleston, Lincoln or West Melton would be subject to this additional charge).

If your relocation requires additional work then we charge $75 per hour for extra labour.

Cable break out fee into distribution box or meter box is charged at $65 per breakout (the may happen if your electrician has not performed the mains cable breakout prior to us attending your site).

If you are purchasing a permanent meter box then we charge $750 for each single phase box and $1250 for a three phase box.